The New River Mine (2 of 15)

[First] [Prev] [Index] [Next] [Last]

Staging on the lower level is completed and the main line and horizontal risers are in for the coal mine site.  In this photo, the main has a 0.75% grade up.  I changed this so that the Main was level and you have to go down a 0.75% grade to get to the coal mine.  You can see the benfit of this decision in later photos.  That is a six track staging yard inside a reverse loop, so the trains are automatically staged for the next Operating session.

p9190153

P9190153