The New River Mine (15 of 15)
It's now July 5, 2006, a little over 3 years to
get here using my work methodology of never do any job in a straight line. All in
all, I am pretty satisfied with the way this has come out. The Coal Turns are one of
the more popular jobs during an operating sesssion and some days can take 30 - 40 minutes
to switch. I built coal loads out of floral foam, and we operate this as an
empties in loads out industy. I may take some time and do a short series on the coal
loads. They end up costing about 0.30 cents a piece and they add a lot to the
operation.
|