The New River Mine (15 of 15)

[First] [Prev] [Index]

It's now July 5, 2006, a little over 3 years to get here using my work methodology of never do any job in a straight line.  All in all, I am pretty satisfied with the way this has come out.  The Coal Turns are one of the more popular jobs during an operating sesssion and some days can take 30 - 40 minutes to switch.  I built coal loads out of floral foam,  and we operate this as an empties in loads out industy.  I may take some time and do a short series on the coal loads.  They end up costing about 0.30 cents a piece and they add a lot to the operation.

NRM 2 7-5-06

NRM 2 7-5-06